Install a complete floor in just a few days at The Run 1000 in veldhoven

Pluggable, fast and efficient

 

Project

At De Run 1000 in Veldhoven, a large business campus is being further expanded in accordance with sustainability label BREEAM ‘Excellent’ and health and well-being label WELL Gold. Mansveld Techniek, responsible for all electrical installations, called on Isolectra’s Wieland pluggable technologies.   

Power supply via floor duct

All new office floors will be equipped with a floor duct, connecting the power supplies for the 4,000 workstations using plug-and-play technology. Together with Mansveld Techniek, an installation plan was set up, with Isolectra taking care of the drawings package and Groothandel Technische Unie being responsible for just-in-time deliveries, while Mansveld Techniek took care of the assembly and kept an eye on progress. Using the installation plan as the basis, we provided all pluggable materials with specific labels. This allows the fitters to see exactly which materials need to be connected at which locations. An installation kit was also developed for each office wing, cleverly clustering all materials for one office wing. 

  • 4000 workstations 
  • Plug & play 
  • Wieland GST18® 
  • Wieland RST20® 
  • Technische Unie 

 

Wieland GST18® en RST20® 

The Wieland GST18® system combined with Wieland RST20® was chosen to power the workstations. That was a circular choice, as both systems were recently listed in the National Environmental Database with a Category 1 Environmental Statement.  

Want to know more about this project? Click here for the full article.

Our knowledge partners