Short preparation time, fast construction time, and fully plug & play.

Fast solution to the housing shortage.

Project

For the RAP Wonen project - affordable, sustainable, and high-quality homes based on prefab concrete elements - Ouwehand Bouwen & Ontwikkelen relied on Isolectra’s Wieland pluggable installations, specifically the RST® system, which can be cast directly into concrete.

 

 

The Right Expertise

Together with Ouwehand Bouwen & Ontwikkelen, Isolectra examined the RAP Wonen label and how the pluggable installation in concrete could be implemented so that the homes could be easily assembled, disassembled, and reassembled. The pluggable installations were pre-cast into the prefab concrete elements, meaning that on-site only the individual building components needed to be connected. By being involved from the design stage, a simple and effective installation concept was developed—at an attractive price.

 

 

 

Short preparation time, fast construction time, and fully plug & play.
  • Sustainable and high-quality homes
  • Prefab concrete elements
  • Fast construction time
  • Plug & Play
  • RST in concrete
  • Remountable
  • Waterproof
Short preparation time, fast construction time, and fully plug & play.
RST20® System as the Foundation
At the heart of this concept is the IP66/68/69k waterproof RST20® system, including lighting points, wall sockets, and cables. The special cables and connectors of this system are robust, reliable, and uniquely certified to be cast directly into prefab concrete walls and floors—without the need for conduits.
Want to know more? Read it here!

 

Our knowledge partners
  • naamloos-1641287912-1648131607.png
  • nen_logo_lid_van_normcommissie_klein2-1643711156-1648131689.jpg
  • logo-fedet-retine-klein-1641287912-1-1648130055.png
  • iso9001-16-1641287912-1648131141.png
  • soiec27001-1715778747.jpg
  • logo_2ba-1641287912-1648131309.png
  • picture-compano-120x100-1643653571-1648131395.png
  • isso-label-partner-rgb-1641287912-1-1648131490.png