The City Post: fast and pluggable installation
Project
For The City Post project – a high-end office building where people and organisations can do business, meet, collaborate and network – installer De Groot Installatiegroep deliberately opted for pluggable installation with Isolectra.
The perfect solution for short lead times and staffing challenges
Pluggable installation offers the perfect solution for short lead times and personnel challenges in construction. Younger workers and temps are increasingly being used. A foolproof system such as pluggable installation is the perfect solution such cases. Additionally, pluggable installation eliminates the need for fitters to reach the wires with their hands. Instead, they only need to assemble. Thanks to different connector colours and clear coding, connection errors are avoided.
- Fast and pluggable
- Short lead times
- Assembly
- Connection errors prevented
- 1300 motion sensors
- GST18i3 connector cable
Over 1300 sensors
Isolectra specified a pluggable system for one floor, which could then be easily extended to the other floors. In total, over 1,300 sensors have been supplied through wholesaler Technische Unie. The new DACO DALI-2 motion sensors were chosen, which are linked to the fixtures via pluggable connections. This solution uses a Wieland GST18i3® coupling cable for the power supply and a Wieland BC14i2® DALI coupling cable for the DALI controls. Wieland coupling cables are also used to connect the light fixtures.
Want to know more about this project? Click here for the full article.